Tuesday, January 15, 2013

TwoDee EVO Assembly guide



first parts to assembly

ready to use 


Roll plates:



Servo holders:



upper side of the roll axis:


note that,flanges must be inner side.


tray holders:

One of them has 2 pieces of 10mm clamps,other one has only one:

same structure like other side.




Now we can assemble our structured parts:









Mounting roll axis:


Now,we are on tray parts:













Dont tight the screws,you need balance the tray on its own location.




Final structure of your TwoDee EVO:

94mxl belt using at tilt and 100mxl belt is using for roll. 













No comments:

Post a Comment